More news

Company news

main

The repair campaign at nuclear power facilities is ahead of schedule, and due to the newly recommissioned domestic power unit, the unified power system of Ukraine receives an additional 1,000

Company news

main

Energoatom's VVER-1000 power unit connected to the grid after scheduled maintenance

KHNPP news

main

A regular meeting of Command Centre on completion of Khmelnytskyy NPP unit 3 was held

Company news

main

The most extensive over the whole period of independence repair campaign at Ukrainian energy facilities is underway

Company news

main

IAEA Director General visited temporarily occupied Zaporizhzhya NPP

ZNPP news

main

For the first time in many months, back-up power input from the Ukrainian power system has finally been restored at the ZNPP

ZNPP news

main

At night, the ZNPP lost the connection to its main 750 kV high-voltage line

ZNPP news

main

Power supply from the main 750 kV line at ZNPP restored – Kotin

ZNPP news

main

russians admit incompetent staff to work at ZNPP

ZNPP news

main

Planet Labs satellite images of July 5 showed the appearance of new objects on the roof of the Zaporizhzhya NPP power unit 4

ZNPP news

main

russia will not avoid responsibility in case of a terrorist attack on the ZNPP – the White House

ZNPP news

main

The intentions of the russian occupationists to put Zaporizhzhya NPP power unit No. 4 into a "hot shutdown" state will create significant additional risks for nuclear and radiation safety –

Сorporatization

main

The government endorsed the plan for Energoatom‘s corporatization

Company news

main

Вартові світла Олександр Ердт, працівник дирекції Енергоатома

Environmental protection

main

There are alternative replenishment sources for Zaporizhzhya NPP cooling pond – Petro Kotin

Environmental protection

main

A drawdown of water level in the Kakhovka Reservoir does not directly affect the drawdown of water level in the ZNPP cooling pond

Environmental protection

main

Undermining of Kakhovka HPP by ruscists may have negative consequences for ZNPP but the situation is under control

Company news

main

One more Energoatom's VVER-1000 power unit brought back into operation after scheduled maintenance

Company news

main

Petro Kotin paid a working visit to one of Ukrainian NPPs

ZNPP news

main

ZNPP Ukrainian staff refuse to carry out unlawful order of plant’s illegitimate management on start-up of power unit 4